DumpLeader's expert team has developed a latest short-term effective training scheme for HP certification HP0-J51 exam, which is a 20 hours of training for the candidates of HP certification HP0-J51 exam. After training they can not only quickly master a lot of knowledge, but also consolidate their original knowledge. So they can easily pass HP certification HP0-J51 exam and it is much more cost-effective for them than those who spend a lot of time and energy to prepare for the examination.
There is no reason to waste your time on a test. If you feel it is difficult to prepare for HP HP0-J51 and need spend a lot of time on it, you had better use DumpLeader test dumps which will help you save lots of time. What's more, DumpLeader exam dumps can guarantee 100% pass your exam. There is no better certification training materials than DumpLeader dumps. Instead of wasting your time on preparing for HP0-J51 exam, you should use the time to do significant thing. Therefore, hurry to visit DumpLeader.com to know more details. Miss the opportunity, you will regret it.
Are you worried about how to passs the terrible HP HP0-J51 exam? Do not worry, With DumpLeader's HP HP0-J51 exam training materials in hand, any IT certification exam will become very easy. DumpLeader's HP HP0-J51 exam training materials is a pioneer in the HP HP0-J51 exam certification preparation.
Exam Code: HP0-J51
Exam Name: HP (Installing HP StorageWorks Solutions)
One year free update, No help, Full refund!
Total Q&A: 123 Questions and Answers
Last Update: 2013-12-30
If you choose DumpLeader, success is not far away for you. And soon you can get HP certification HP0-J51 exam certificate. The product of DumpLeader not only can 100% guarantee you to pass the exam, but also can provide you a free one-year update service.
If you DumpLeader, DumpLeader can ensure you 100% pass HP certification HP0-J51 exam. If you fail to pass the exam, DumpLeader will full refund to you.
HP0-J51 Free Demo Download: http://www.dumpleader.com/HP0-J51_exam.html
NO.1 What is the recommended minimum block size that should be configured when backing up to D2D
systems?
A. 64KB
B. 128KB
C. 256KB
D. 1MB
Answer: A
HP HP0-J51 original questions HP0-J51 HP0-J51
NO.2 In an HP P2000 storage array, the Drive Spin Down (DSD) feature can reduce power consumption by
powering down drive spindles. Which statements correctly describe the DSD feature? (Select two.)
A. Disk scrubbing is disabled when DSD is enabled.
B. Only RAID configured vdisks can be spun down.
C. Drive Spin Down delay defaults to 15 minutes.
D. Default state is enabled.
E. Only drives that reside in vdisks can be spun down.
Answer: A,C
HP original questions HP0-J51 HP0-J51 HP0-J51 exam HP0-J51 Bootcamp
NO.3 Which method of deduplication is used in the HP StoreOnce D2D devices?
A. fixed-length data segmenting
B. variable-length data segmenting
C. object-level differencing
D. hash-based chunking
Answer: D
HP demo HP0-J51 answers real questions HP0-J51 certification training HP0-J51 questions
NO.4 Which HP P4000 management tool should you use to gather storage system status information?
A. Centralized Management Console (CMC)
B. HP Integrated Lights Out (ILO)
C. Web Based Enterprise Management (WBEM)
D. System Management Homepage (SMH)
Answer: A
HP HP0-J51 HP0-J51 Bootcamp HP0-J51
NO.5 Your customer wants to monitor the performance of a P4000 G2 system. What is the minimum time
sample interval that can be set using the Performance Monitor?
A. 1 second
B. 5 seconds
C. 30 seconds
D. 1 minute
Answer: B
HP study guide HP0-J51 HP0-J51
NO.6 What information is displayed in the Configuration View panel overview of the P2000 SMU about the
status of any FC hosts attached to it? (Select two.)
A. connection type
B. WWPN
C. HBA Firmware revision
D. operating system
E. profile
Answer: B,E
HP HP0-J51 HP0-J51 HP0-J51 HP0-J51
NO.7 A customer wants to add a drive enclosure to his existing P2000 G3 system. What is the maximum
distance allowed between enclosures?
A. 1m
B. 2m
C. 5m
D. 10m
Answer: B
HP HP0-J51 HP0-J51 braindump HP0-J51 HP0-J51 HP0-J51
NO.8 When running diagnostics on a P4000 system you notice that the "BBU Capacity Test" is unchecked by
default. Why is this? (Select two.)
A. The test is not supported on any P4000 system.
B. The test can take up to 24 hours to complete.
C. The test can overwrite HDD data.
D. The test sends data to HP via the Internet.
E. The test turns off the controller's cache.
Answer: B,E
HP HP0-J51 questions HP0-J51 practice questions HP0-J51 practice questions HP0-J51 pdf
NO.9 Which CLI command is used to verify the setting of the IP address of a P2000 G3 Storage Array?
A. show ip-address
B. show network-parameters
C. show network-address
D. show network
Answer: B
HP HP0-J51 Bootcamp HP0-J51 dumps HP0-J51 exam dumps
NO.10 What is a feature of P4000 snapshots?
A. Snapshots are thin provisioned but can be made fully provisioned after being created.
B. As the original volume data changes the snapshot remains the same as the volume at its creation time.
C. The same amount of space is reserved for the snapshot as the original volume.
D. The snapshot is thinly provisioned and requires no reserve space.
Answer: D
HP HP0-J51 HP0-J51 HP0-J51
NO.11 Where can you find the DHCP-assigned IP address on your D2D system during initial
configuration?
A. Web Management Interface
B. VGA Console
C. Telnet
D. CommandView TL
Answer: B
HP certification training HP0-J51 exam prep HP0-J51 HP0-J51
NO.12 Which browser is supported to access X1000 Windows Server Remote Administration Applet from a
non-Microsoft computer?
A. Apple Safari
B. Google Chrome
C. Microsoft Internet Explorer
D. Mozilla Firefox
Answer: D
HP pdf HP0-J51 study guide HP0-J51 HP0-J51 study guide HP0-J51
NO.13 Which P2000 G3 Combo FC/iSCSI controller ports would be most suitable for replicating snapshots to
remote locations?
A. 1GbE iSCSI
B. 10GbE iSCSI
C. 4Gb FC
D. 8Gb FC
Answer: A
HP HP0-J51 test answers HP0-J51
NO.14 Which D2D network configuration mode will improve the availability of overall network bandwidth?
A. Single Port Configuration
B. Dual Port Configuration
C. High Availability (Port Failover) Configuration
D. High Availability (Link Aggregation) Configuration
Answer: D
HP HP0-J51 exam prep HP0-J51 exam simulations HP0-J51 answers real questions HP0-J51
NO.15 A consultant meets with a customer to define a Disaster Recovery plan based on HP VLS technology.
What are the most important parameters the consultant must obtain from the customer.? (Select two.)
A. Recovery Point Objective
B. Restore Point Objective
C. Recovery Time Objective
D. Retention Point Objective
E. Retention Time Objective
Answer: A,C
HP exam simulations HP0-J51 HP0-J51
NO.16 A consultant is discussing with a customer how to create a four node multi-site cluster with the P4000
G2 family of products. The customer wants two physical sites, one being the primary. What is the
minimum total number of managers that should be run to guarantee quorum?
A. 2
B. 3
C. 4
D. 5
Answer: B
HP dumps HP0-J51 HP0-J51 questions
NO.17 The HP P2000 G3 FC Storage Array supports both the MSA70 and D2700 disk enclosures. When
connecting these enclosures to the P2000 G3 FC controller, where can the MSA70 enclosure be cabled
without limiting performance?
A. any location
B. before all D2700 enclosures
C. after all D2700 enclosures
D. after the first D2700 enclosure
Answer: C
HP HP0-J51 HP0-J51 HP0-J51
NO.18 In the Storage Management Utility for a P2000 G3, which wizards are available to allow you to quickly
and easily set up the system? (Select two.)
A. Drive Wizard
B. Configuration Wizard
C. Replication Setup Wizard
D. Hosts Wizard
E. Physical Setup Wizard
Answer: B,C
HP HP0-J51 HP0-J51 test answers
NO.19 You are meeting with a customer who has many different backup applications and operating systems.
To identify which operating systems are supported with each backup application by VLS and D2D, which
HP document should you consult?
A. Storage Compatibility Matrix
B. EBS Compatibility Matrix
C. Backup Solutions Guide
D. Storage Backup Matrix
Answer: B
HP test HP0-J51 HP0-J51 exam prep HP0-J51
NO.20 A customer has two HP P2000 G3 FC arrays. One is located at a remote branch office. You have been
asked to configure a replication set between the two arrays. Which components are required to form a
replication set? (Select two.)
A. external view volume
B. primary view volume
C. host accessible remote volume
D. destination snap pool
E. source snapshot
Answer: A,D
HP HP0-J51 HP0-J51 HP0-J51
DumpLeader offer the latest 400-051 exam material and high-quality 100-101 pdf questions & answers. Our HP2-N43 VCE testing engine and 70-492 study guide can help you pass the real exam. High-quality VCP510PSE dumps training materials can 100% guarantee you pass the exam faster and easier. Pass the exam to obtain certification is so simple.
Article Link: http://www.dumpleader.com/HP0-J51_exam.html
没有评论:
发表评论